A concrete block is a building block made of cement and aggregate. Concrete blocks are used in construction, for example as a formwork for reinforced concrete or as the structural element in post-and-beam structures.
Concrete brick curing process:
After the concrete blocks are transported to the maintenance site for stacking, wait for the strength of the concrete blocks to increase.
Usually, watering is not required on the first day, because the cement of the concrete blocks is easily washed away.
If it is maintained in the open field, it is best to cover it with straw curtains or plastic.
The membrane remains moist.
After 6-8 hours or the next day, when the strength of the concrete blocks is sufficient, the blocks slabs are separated and the blocks are stacked,
and watering and maintenance can be started.
There is no time limit in the open field, mainly to keep the bricks moist,
usually 2-3 times, for at least 7-10 days, the curing strength of concrete blocks can reach about 70%.
The state stipulates that curing is required for 28 days, but usually it will be sold in 7-10 days.
So you need to keep the blocks moist all the time.
Back To The ListThe Molding Vibration Block Machine has a short forming cycle and high production output. The continuous increase in vibration frequency during material feeding and forming vibrations reduces the feeding time by 3 to 4 seconds. The table vibration machine
Brick manufacturing has been an essential part of construction for centuries, providing durable and aesthetically pleasing building materials. However, the process of producing bricks is not without its challenges. As the world becomes more environmentall
Whether for inquiries for inspections and
maintenance, for individual plant optimizations or
extensions, or spare and wear parts.
Our after-sales service is at your disposal for all
questions
We will contact you within 24 hours.